Skip to content

Turbine Journal Repair

Lanbo field service

Oil starvation, bearing wipes or long service can leave large scores and wear on turbine rotor journals. Lanbo repairs them in place with on-site journal turning and grinding: the rotor does not have to be removed or shipped, which saves transport cost and shortens the outage.

A typical repair is completed within five days. Lanbo has repaired rotor journals on 200 MW and 300 MW units in Chinese power plants, and in December 2009 an on-site journal repair on a 1000 MW unit at Haimen Power Plant (Dongfang Turbine) passed the post-repair acceptance review.

All field services
+ Tube details (optional, for a more accurate quote)
We only use your details to respond to your inquiry. We typically reply within one business day (GMT+8).
WhatsAppEmailCallQuoteTop